NORWALK, CALIFORNIA

City of Norwalk Veterans' Memorial

Date of Completion
Materials
Size
Description

:
:
:
:

April 28, 2017
Absolute Black Granite
6.5’ wide x 3.5’ deep x 20’ tall (Five Monoliths)
Permeco was contacted by the project architect to collaborate the structural design details in order to make the artist, Nan Butler Beckstrom’s, design concept a reality.
This government funded public works renovation included six granite panels on each monolith. Weight on some panels exceeding 750 lbs. Each panel was inscribed using laser imaging techniques—the final result, stunning, high-quality resolution graphics. Side one of each monolith displays the core values and creeds of the branch. Side two serves as a historical timeline.
Installation of these mammoth panels involved a great deal of technical skill. Our four-man installation crew has over 120 years combined experience working in granite construction. These guys did a great job and finished ahead of schedule, despite time constraints.

Date of Completion: April 28, 2017
Materials: Absolute Black Granite
Size: 6.5’ wide x 3.5’ deep x 20’ tall (Five Monoliths)

Permeco was contacted by the project architect to collaborate the structural design details in order to make the artist, Nan Butler Beckstrom’s, design concept a reality.
This government funded public works renovation included six granite panels on each monolith. Weight on some panels exceeding 750 lbs. Each panel was inscribed using laser imaging techniques—the final result, stunning, high-quality resolution graphics. Side one of each monolith displays the core values and creeds of the branch. Side two serves as a historical timeline.
Installation of these mammoth panels involved a great deal of technical skill. Our four-man installation crew has over 120 years combined experience working in granite construction. These guys did a great job and finished ahead of schedule, despite time constraints.

IMPRESSED BY OUR WORK?

Let's Collaborate!